DescriptionThe airport was expected to cease operations on October 27, 2018 with the opening of the new Ramon Airport [2] However, the opening of the new airport was delayed until January 21, 2019.[3][4][5]
Following the inauguration of Ramon airport located approximately 20 km north of the city, Eilat Airport ceased operations on 18 March 2019.[6] The new, larger airport now handles all of Eilat’s domestic and international flights. The above description has been prepared by IPACS forum user stu_records. Although this website is moderated as far as is possible, the text above does not represent the views of the administrator of FSCloudPort. If you have any concerns about the above content please email admin@
Runways03 / 211944m x 36mModel size:1960m40mAuthor
Download SectionFOR PERSONAL USE ONLY. CONTACT [email protected] FOR COMMERCIAL USE Download instructions for a fully modelled airport follow Click for basic TSC
|